Built by a PM, for PMs

Every project tool shows where you are. Senshin exists because none of them show where you're going.

PMs are flying blind

Dashboards show status. Gantt charts show dates. Risk logs collect dust. But none of these tools tell you what's about to go wrong — or what to do about it before it reaches the steering committee.

The result: PMs spend their careers reacting to surprises that were visible weeks earlier, buried in the data they already had.

The crystal ball for projects

See what's coming. Act before it hits.

Senshin is a judgement layer above your systems of record — Jira, MS Project, Asana, spreadsheets. It reads the signals those tools produce and tells you what they mean together: which risks are compounding, which dependencies are about to break, which decisions are overdue.

Not a dashboard. Not a collaboration tool. A reasoning engine that thinks the way a senior PM thinks — except it never forgets, never gets tired, and never stops watching.

What Senshin catches
⚠️ Budget burn rate + stale updates = credibility erosion
🔴 3 risks compounding + SteerCo in 6 days = escalate now
🟡 Dependency gap + milestone bunching = schedule fragile

Deterministic reasoning, not guesswork

36
Delivery signals tracked
52
Deterministic deduction rules
16
Dimensions of project health

One PM who got tired of being blindsided

AL
Alex
Founder · Programme Manager · 20+ years in delivery
ERP transformations, post-acquisition integrations, regulatory change programmes, politically complex stakeholder environments. Two decades of being handed failing projects with no clean plan, asked for dates before discovery was complete, and held accountable for outcomes beyond anyone's control. Senshin is the tool I always needed — the one that sees what's about to go wrong and gives you the evidence to act before it does.

Principles, not platitudes

Evidence over opinion
Every signal Senshin surfaces is traceable to data. No hand-waving. No gut feelings dressed as AI. If we can't justify it, we don't show it.
Challenge by default
The best PMs want their assumptions tested, not confirmed. Senshin challenges your plan the way a trusted senior PM would — directly, with evidence, on your side.
Solo founder, no shortcuts
No VC runway. No growth-at-all-costs. One engineer building the product he needed. Every feature earns its place by solving a real delivery problem.

What PMs are saying

Three programme managers, three different fires — same quiet relief.

Your next project.
Seen before it breaks.

UAT test access. Full product. No credit card.

Start test
Log in →